Designed for controlled, compliant marine operations.
The yard is designed to support planned dry dockings, emergency repairs, steel renewal, blasting and painting, propulsion repairs and marine equipment operations.
Work is planned against the vessel’s programme, permitted and risk-assessed before it starts, and coordinated with the attending class surveyor through to acceptance.
YARD DATA
Every figure, on the water.
30,000m²
Total site · Al Hidd, Muharraq
01
Quayside
240m
Concrete jetty — water depth 4 – 5.8 m
02
Slipway
5 × 50m
Berths for vessels up to 700 t — combinable for LOA above 50 m
03
Workshops
960m²
Enclosed halls — 7 t overhead crane
04
Storage
775m²
Covered & secured indoor space
05
Lifting
60t
Mobile crane — forklifts 2.5 / 3 / 8 t
06
Dry docking
700t
Dredgers, barges, tugs and yachts
07
Afloat repairs
220m LOA
Alongside at 4.5 – 6.0 m draft
08
Operations
0
Round-the-clock berth working
WHY AL HIDD
The right location for demanding marine work.
i.
The Kingdom’s busiest repair zone
In the heart of Bahrain’s most active ship-repair district.
ii.
Streamlined access for authorized crews and contractors.
Site access is arranged directly with the yard for approved crews, contractors and vendors.
iii.
Minutes from every port
Bahrain & US Navy 4–5 km · Coast Guard & Khalifa Bin Salman Port 2–3 km.
iv.
Group facilities next door
Accredited machining (NIS), blasting and painting booths, Sarens/Nass crane rental.
AROUND THE YARD



Berth availability changes daily. Tell us the vessel and the scope.

